Overcoming Analysis Paralysis in Engineering
Engineers often face situations where not all the necessary information is available. Boundary conditions may be unclear, or material properties may be incomplete. These gaps can create uncertainty about the reliability of the analysis, leading to what many call analysis paralysis.
The Challenge
It’s tempting to think: “I can’t proceed without this data.” And in some cases, that’s valid. But in most projects, halting progress until every piece of data is perfect simply isn’t an option. Deadlines, budgets, and design schedules demand forward movement.
The Solution: Progress, Not Perfection
Engineering analysis is always an approximation of reality. The goal isn’t perfection, but actionable insight that allows the project to move forward.
When faced with missing or incomplete data:
-
Interpolate or extrapolate from existing information
-
Reference similar materials to make informed estimates
-
Document assumptions and methods so results are traceable and transparent
This approach doesn’t mean relying on blind guesswork. Instead, it’s about creating a structured method for filling data gaps responsibly — ensuring the analysis remains useful without stalling development.
Key Takeaway
Analysis paralysis can be more damaging than imperfect data. By applying engineering judgment, making educated estimates, and clearly documenting assumptions, teams can keep projects moving while maintaining technical integrity.
Progress beats perfection — and in engineering, momentum often makes the difference between a stalled concept and a successful product.
Norman T. Neher, P.E.
Analytical Engineering Services, Inc.
Elko New Market, MN
www.aesmn.org